PROPOSED NEW COMMUNITY CENTER




SUMMARY OF NEED:

The Community Center, built in 1973, has 8,100 square feet of program space.  It shows signs of aging including a leaky roof, a cracked wall with daylight showing through.  There is significant settling, cracking and separating on the east masonry wall.  The HVAC and ventilation system is inefficient to meet the demands of larger groups. The square footage and ceiling height in the multipurpose room limits the types of sport and team activities that can be offered to adults and children older than age 10. There is no fire suppression system in the office and multipurpose areas.

A Town Hall meeting to discuss the Community Center bond proposal was held Wednesday, September 19th. Our next Town Hall meeting, to discuss the Capital Improvement Project Millage, is scheduled for 6:30 pm Thursday, October 11th, at the Public Safety Building, 2395 Twelve Mile. 

Current Community Center BuildingCommunity Cntr - Copy (2)

Conceptual rendering:  
Proposed Community Center

Community Cntr Concept 


Click here
 for construction cost details for the proposed new facility.



November 6, 2018 ballot proposal Language
Community Center Bond Proposal

Shall the City of Berkley, Michigan, borrow the principal sum of not to exceed Fifteen Million Three Hundred Seventy-Five Thousand Dollars ($15,375,000), payable in not to exceed twenty-one (21) years from the date of issue, and issue its unlimited tax general obligation bonds to pay the cost of acquiring, constructing, furnishing and equipping a new community center, including demolition of existing structures, parking and site improvements? The estimated millage to be levied in 2019 is 0.8837 mills ($0.88 per $1,000 of taxable value) and the estimated simple average annual millage rate required to retire the bonds is 1.6335 mills ($1.63 per $1,000 of taxable value).

[  ] YES                              [  ]       NO

MUNICIPAL INFRASTRUCTURE IMPROVEMENTS
FREQUENTLY ASKED QUESTIONS ABOUT THE 
PROPOSED NEW COMMUNITY CENTER

Click here for an FAQ that provides additional information about the proposed Community Center features, potential uses program offerings and funding method for the proposed Community Center.


PROPOSED COMMUNITY CENTER OVERVIEW

Current Site

CURRENT SITE


Proposed Alternate Site

CC site overview


CONCEPTUAL RENDERINGS


Community Cntr Concept  Exterior View

Interior Entry & Hall   

Community Cntr Concept Hall













DESIGN FEATURES

38,000 square feet

  • Two stories
  • ADA accessible
  • Secure for after-school programs
  • Energy efficient
  • Views to outdoors
  • Visible from Catalpa

Building Support

  • Catering Kitchen
  • Locker Rooms
  • Restrooms
  • Family Restroom
  • Nursing Room
  • Storage
  • Utilities

MultiPurpose Space

  • Multipurpose Two-Court Gym and Banquet Center
  • Elevated Indoor Track
  • Fitness area
  • Dance Studio 

Site

  • Visible signage and building
  • Distance from homes
  • New parking and drop-off
  • Stormwater management
  • Outdoor plaza
  • Lawn for play and games
  • Connection to park and playfields

Activity Rooms

  • Multipurpose Classrooms
  • Senior Room
  • Teen Room

 

Common Spaces

  • Lobby
  • Reception
  • Meeting 


PROPOSED FIRST FLOOR 


CC 1st floor - Copy


PROPOSED SECOND FLOOR

CC 2nd floor - Copy

MULTIPURPOSE ROOMS

Gym / Banquet Space
CC Gym

CC Class of 1969


Dance / Classroom Space


   CC Dance StudioCC Multipurpose space